PLATFORM 2, WESTBOUND MAINLINE

DESCRIBE ONLINE

Overview

There's a waiting area about in the middle of the platform which has two sets of automatic doors. the set nearer the front of the train leads to the escalators, whilst the other set is nearer the lift and stairs. There is a walkway between the two sections of the waiting area.

There is tactile paving along the edge of this platform.

To Reach

Via the Escalator

The left-hand escalator is normally the one you need. turn right at the top, through the automatic doors, onto the platform. We believe you're beside the front half of the train.

Via the Lift

The lift is opposite the foot of the escalators, the call button is to your right of the door. Go up to platform level.

Leave via the other doors then turn right and follow the wall round to your right (north), then right again (east). Continue (east) through the automatic doors. We believe you're about in the middle of the train.

Via the Stairs

There's tactile flooring at the top and bottom of these stairs.

The foot of the stairs is on your left at the far end of the passage towards the westbound platform 2. At the end of the passage, turn left south, go up ten then six steps, going south. There are two fire exit doors in front of you, note signs indicate that these are alarmed. There's tactile flooring before you reach these doors.

Turn left (180 degrees, north), go up eight steps, going north, there's a blank door in front of you. Turn right (180 degrees, south), go up eight steps, going south, then turn right again (180 degrees, north) and go up eight steps, going north, to platform level.

As you reach the top of the steps, the recess to the lift is to your right, continue beyond this before turning right (east) and continue, through the automatic doors onto the platform. We believe you're about in the middle of the train.

The Waiting Area

The North Section

South Side, Going West

  passage to south section
down escalator
up escalator

West Side

  wall with windows
seats

North Side

  billboards and pillars

East Side

  automatic doors onto platform, tactile flooring in front

The South Section

This is a rectangular space with a passage leading south towards the lift and stairs.

The Passage

East Side
  recess to lift
North Side
  lift, call button to left
East Side
  blank
Continuing East Side
  blank wall beside lift
wall retreats
billboards
South End, Going West
  seats, opposite lift
top of stairs
blank door
East Side
  blank door
blank door, jutting out

South Side, Going West

Note that there's a pillar that leans into this space from the southeast corner.

  wall behind lift
passage to lift and stairs
wall

West Side, Going North

  glass wall with pillars and seats

North Side, Going East

  glass wall, behind escalators
passage toward north section

East Side, Going South from the North Section

  wall with windows
pillars on each side
slope up
doors to platform, tactile flooring in front

Platform 2, from the South

  slope off end
post
wall
post
CCTV camera, post in middle
post
post with CCTV camera and departure screen
seats
CCTV camera
help point, left-hand button for assistance, right-hand for train information
CCTV camera
metal gate, not for public use
glass wall of waiting area starts
automatic doors towards lift and stairs
departure screen
CCTV camera
automatic doors towards escalators
metal gate, not for public use
CCTV camera
wall
post
departure screen, plus three and six car stop signs
slope off end

Back Links

DETAILED DESCRIPTION

PARTICK STATION

© 2009, Terry Robinson