PLATFORMS 4 AND 5

DESCRIBE ONLINE

Overview

There's a row of single pillars along the platform, good tactile paving within each edge.

From the Barrier

  4 departure screens, overhead
mobile ticket sales, at time of survey
billboards and benches in line with pillars
trolley point after 3rd pillar
digital clocks after 4th
screens between 5th and 6th, one per platform
trolley point between 8th and 9th
trolley point before screens facing steps
pillar
steps up east to bridge

Back Links

DETAILED DESCRIPTION

MANCHESTER PICCADILLY STATION

© 2004, Terry Robinson